Document Details


Document Number:
EI 84-055
Title:
Project Costs
Status:
Inactive
Issue Date:
10/31/1984
Effective Date:
10/31/1984
Expiration Date:
12/1/1998
Resp Organization:
Design Quality Assurance Bureau
Contact:
EDWARDS, ROGER
Phone:
518-457-
Email:
Item Numbers:
Drawings:
Keywords:
PROJECT,COSTS,PROGRAMMED COST,ESTIMATE,M&PT,BRIDGES
Shelf Notes:
No
Standard Book:
No
Modified By:
(85-027)Design Reports/Scope Change Request Procedure
Superseded By:
(98-045) Highway Design Manual Revision No. 34; Chapter 21 Contract Plans, Specifications, and Estimate
File:
EI 84-055
Abstract: