Document Details


Document Number:
EI 08-041
Title:
Special Specification for Full Depth Reclamation of Asphalt Pavement
Status:
Inactive
Issue Date:
11/5/2008
Effective Date:
5/7/2009
Expiration Date:
8/2/2023
Resp Organization:
Geotechnical Engineering Bureau
Contact:
Randall J. Romer
Phone:
518-457-4714
Email:
rromer@dot.state.ny.us
Item Numbers:
Drawings:
Keywords:
FDR,Road Reclaimers,Milling Drums,Subbase,Pulverizing,blending
Shelf Notes:
No
Standard Book:
No
Superseded By:
(23-024) Superseding Outdated Engineering Instructions
File:
EI 08-041
Abstract:
The Department has recently identified several low to medium traffic volume highways that are in need of pavement rehabilitation. It has been determined that full depth reclamation of asphalt concrete pavements is a more cost effective means to rehabilitate these TYPE_s of low to medium traffic volume roads, proportionally increasing service life when compared to full depth reconstruction. The full depth reclamation process also conserves natural resources by recycling existing materials. The conservation of natural resources is compounded when you consider the conservation of additional natural resources ( natural gas, petroleum products, etc.) necessary to produce, deliver and use new materials required in full depth reconstruction.