Document Details


Document Number:
EI 08-006
Title:
Standard Specifications Section 207- Geosynthetics, Standard Specifications Section 209 - Soil Erosion and Sediment Control
Status:
Inactive
Issue Date:
2/14/2008
Effective Date:
9/4/2008
Expiration Date:
9/27/2015
Resp Organization:
Geotechnical Engineering Bureau
Contact:
Randall Romer
Phone:
518-457-4714
Email:
rromer@dot.state.ny.us
Item Numbers:
207.20,207.21,207.22,207.23,207.24,207.25,207.26,207.27,209.1104,209.1105,209.13,209.15,209.1701,209.1703,209.22,209.23,Geotextile,Fabric,Geomembrane,Vertical Drains,Structural Drains,Edge Drains,Geogrids,Plastic Reinforcement,Undercut,slope protection,Bedding,Separation,Drainage,stabilization,silt fence
Drawings:
Keywords:
207.20,207.21,207.22,207.23,207.24,207.25,207.26,207.27,209.1104,209.1105,209.13,209.15,209.1701,209.1703,209.22,209.23,Geotextile,Fabric,Geomembrane,Vertical Drains,Structural Drains,Edge Drains,Geogrids,Plastic Reinforcement,Undercut,slope protection,Bedding,Separation,Drainage,stabilization,silt fence
Shelf Notes:
No
Standard Book:
No
Modified By:
(09-035)Revised Specification Section 209- Soil Erosion and Sediment Control
(13-014)Standard Specification Section 207 - Geosynthetics
Superseded By:
(15-031) Superseded Issuances Resulting from Adoption of Electronic Standard Specifications as Official Documents
File:
EI 08-006
Abstract:
The NYS Department of Transportation is implementing Trns*port SiteManager, including both Construction and Materials functionality. Implementation of standard AASHTO software enables SiteManager to allow revising business practices to be more consistent with industry-accepted best practices. The revisions to the Standard Specifications are to conform to SiteManager's methodology in defining its Material Codes and Pay Items. Section 207 and Section 209-2 Materials were revised to refer to the appropriate subsections of Section 737 (Geosynthetics).