Document Details


Document Number:
EI 09-035
Title:
Revised Specification Section 209- Soil Erosion and Sediment Control
Status:
Inactive
Issue Date:
2/9/2010
Effective Date:
9/2/2010
Expiration Date:
9/27/2015
Resp Organization:
Design Quality Assurance Bureau
Contact:
Gary Glath
Phone:
518-457-5286
Email:
gglath@dot.state.ny.us
Item Numbers:
209
Drawings:
Keywords:
Shelf Notes:
Yes
Standard Book:
No
Supersedes These:
(05-022) Revised Standard Details for Turbidity Curtains
(06-005)Design Guidance for Standard Specifications for Section 209 Erosion and Sediment Control and Section 713-07 Rolled Erosion Control Products and Soil Stabilizers
(07-013)Reissue of Revision to Standard Specifications- 209 Erosion and Sediment Control, 610 Turf and Wildflower Establishment and 713 Landscape Development Materials
(06-004)Revisions to Standard Specifications Section 209 Erosion and Sediment Control and Section 713-07 Rolled Erosion Control Products and Soil Stabilizers
Modifies These:
(08-006)Standard Specifications Section 207- Geosynthetics, Standard Specifications Section 209 - Soil Erosion and Sediment Control
Superseded By:
(15-031) Superseded Issuances Resulting from Adoption of Electronic Standard Specifications as Official Documents
File:
EI 09-035
Abstract:
This EI issues revisions and updates to section 209 of the Standard Specifications. Several improvements have been identified through visits to Regional Offices and numerous discussions with designers, construction personnel,regulators and contractors.