Document Details


Document Number:
EI 03-003
Title:
Special Specifications for Soldier Pile and Lagging Walls and Sta-Pod Armor Units
Status:
Inactive
Issue Date:
1/24/2003
Effective Date:
5/8/2003
Expiration Date:
8/2/2023
Resp Organization:
Geotechnical Engineering Bureau
Contact:
Randy Romer
Phone:
518-457-4714
Email:
rromer@dot.state.ny.us
Item Numbers:
Drawings:
Keywords:
Shelf Notes:
No
Standard Book:
No
Modifies These:
(02-039)Revised Materials Specifications for the Implementation of Precast Concrete QC/QA Procedures
Modified By:
(10-034)Section 552 - Externally Stabilized Cut Structures
Superseded By:
(23-024) Superseding Outdated Engineering Instructions
File:
EI 03-003
Abstract:
EI 02-039 inadvertently discontinued the use of the special specifications for the construction of soldier pile and lagging walls and the installation of Sta-Pods. These specifications are the most current and appropriate for these walls and erosion control systems. This EI reinstates those special specifications, revised to conform with the revised Materials Bureau's specifications for the implementation of precast concrete QC/QA procedures.