EI 02-039 inadvertently discontinued the use of the special specifications for the construction of soldier pile and lagging walls and the installation of Sta-Pods. These specifications are the most current and appropriate for these walls and erosion control systems. This EI reinstates those special specifications, revised to conform with the revised Materials Bureau's specifications for the implementation of precast concrete QC/QA procedures.