Document Details


Document Number:
EI 02-039
Title:
Revised Materials Specifications for the Implementation of Precast Concrete QC/QA Procedures
Status:
Inactive
Issue Date:
12/5/2002
Effective Date:
5/8/2003
Expiration Date:
5/3/2007
Resp Organization:
Materials Bureau
Contact:
Field Engrg 1, Mtrls Bureau
Phone:
518-457-5956
Email:
Item Numbers:
Drawings:
Keywords:
QUALITY CONTROL,APPROVED LIST,BOX CULVERT,DRAINAGE UNIT,MEDIAN BARRIER,RETAINING WALL
Shelf Notes:
Yes
Standard Book:
No
Supersedes These:
(95-010) New Precast Concrete General Specification and Revised Precast Concrete Barrier and Precast Concrete Box Culvert Specifications
(97-005)Revised Specifications for Armor Units (Sta-Pods) and Precast Concrete Headwalls for Lateral Outlet Pipes
(99-022)Revised Specification for Precast Concrete Headwalls for 100 mm Lateral Outlet Pipes
Modified By:
(03-003)Special Specifications for Soldier Pile and Lagging Walls and Sta-Pod Armor Units
Superseded By:
(06-057) 2006 Standard Specifications for Construction and Materials (Metric)
File:
EI 02-039
Abstract:
Issues revised standard materials specifications for precast products and disapproves a number of special specifications.