Document Details
- Document Number:
- EI 02-039
- Title:
- Revised Materials Specifications for the Implementation of Precast Concrete QC/QA Procedures
- Status:
- Inactive
- Issue Date:
- 12/5/2002
- Effective Date:
- 5/8/2003
- Expiration Date:
- 5/3/2007
- Resp Organization:
- Materials Bureau
- Contact:
- Field Engrg 1, Mtrls Bureau
- Phone:
- 518-457-5956
- Email:
- Item Numbers:
- Drawings:
- Keywords:
- QUALITY CONTROL,APPROVED LIST,BOX CULVERT,DRAINAGE UNIT,MEDIAN BARRIER,RETAINING WALL
- Shelf Notes:
- Yes
- Standard Book:
- No
- Supersedes These:
- (95-010) New Precast Concrete General Specification and Revised Precast Concrete Barrier and Precast Concrete Box Culvert Specifications
- (97-005)Revised Specifications for Armor Units (Sta-Pods) and Precast Concrete Headwalls for Lateral Outlet Pipes
- (99-022)Revised Specification for Precast Concrete Headwalls for 100 mm Lateral Outlet Pipes
- Modified By:
- (03-003)Special Specifications for Soldier Pile and Lagging Walls and Sta-Pod Armor Units
- Superseded By:
- (06-057) 2006 Standard Specifications for Construction and Materials (Metric)
- File:
- EI 02-039
- Abstract:
- Issues revised standard materials specifications for precast products and disapproves a number of special specifications.