Document Details


Document Number:
EI 09-027
Title:
Section 733- Earthwork Materials
Status:
Inactive
Issue Date:
12/21/2009
Effective Date:
5/6/2010
Expiration Date:
9/27/2015
Resp Organization:
Geotechnical Engineering Bureau
Contact:
Randal J. Romer
Phone:
518-457-4714
Email:
rromer@dot.state.ny.us
Item Numbers:
Drawings:
Keywords:
CLSM, MSES, GRES, subbase, glass, RAP, RCA, embankment, borrow, fill, slope protection, sand, winter earthwork, settlement gauge, stone filling
Shelf Notes:
Yes
Standard Book:
No
Supersedes These:
(08-035) Section 733 - Earthwork Materials
(08-038)Section 733 - Earthwork Materials: Mechanically Stabilized Earth System Backfill Material, Geosynthetic Reinforced Earth System Slope Backfill Material
Modified By:
(14-009)Standard Specification § 733-16 Winter Earthwork
(12-015)Standard Specification 733-01 Flowable Fill
(11-001)Mechanically Stabilized Earth System Backfill Material
(13-006)Standard Specification 733-02 Mechanically Stabilized Earth System Backfill Material
(11-011)Revision to Standard Specification 733-20 Underdrain Filter Material
Superseded By:
(15-031) Superseded Issuances Resulting from Adoption of Electronic Standard Specifications as Official Documents
File:
EI 09-027
Abstract:
The NYS Department of Transportation is implementing Trns*port SiteManager, including both Construction and Materials functionality. Implementation of standard AASHTO software enables SiteManager to allow revising this agency's practices to be more consistent with industry-accepted best practices. The revisions to the Standard Specifications are to conform to SiteManager's methodology in defining its Material Codes and Pay Items. Specification 733-04 is being assigned the material specifications related to subbase course. Specification 744-05 through specification 733-07 and Specification 733-19 are being assigned the material specifications related to recycled materials that may be used as an alternate to a granular subbase material. Specification 733-08 through Specification 733-16 are being assigned the material specifications related to earthwork. Specification 733-17 and Specification 733-18 are being assigned the material specifications related to embankment construction control devices. Specification 733-20 is being assigned the material specifications related to underdrain filter material. Specification 733-21 through Specification 733-23 are being assigned the material specifications related to stone filling and rip-rap installations. These changes align the specifications with SiteManager's methodology in defining its Material Codes and Pay Items, with Items referring to one or many materials.