Document Details


Document Number:
EI 09-028
Title:
Special Specification for Subsurface Settlement Gauge
Status:
Inactive
Issue Date:
12/21/2009
Effective Date:
5/6/2010
Expiration Date:
8/2/2023
Resp Organization:
Geotechnical Engineering Bureau
Contact:
Randall J. Romer
Phone:
518-457-4714
Email:
rromer@dot.state.ny.us
Item Numbers:
203.1101--17
Drawings:
Keywords:
Embankment, manometer, monitor, Construction Control
Shelf Notes:
No
Standard Book:
No
Superseded By:
(23-024) Superseding Outdated Engineering Instructions
File:
EI 09-028
Abstract:
A subsurface settlement gauge is typically used to monitor settlement during the construction of an embankment. The gauge is installed below the existing grade, prior to embankment construction, to isolate the settlement in a layer of soft material. The item for the subsurface settlement gauge is being removed from the Standard Specifications due to limited use. A special specification is being created to maintain the ability to specify the item on future contracts.