Document Details
- Document Number:
- EI 08-003
- Title:
- Highway Design Manual Chapter 8 Highway Drainage Section 8.6.2.4 Economics
- Status:
- Inactive
- Issue Date:
- 2/1/2008
- Effective Date:
- 9/4/2008
- Expiration Date:
- 5/5/2010
- Resp Organization:
- Design Quality Assurance Bureau
- Contact:
- Norman Schips
- Phone:
- 518-485-8611
- Email:
- nschips@dot.state.ny.us
- Item Numbers:
- Drawings:
- Keywords:
- HDM,Highway Design Manual,HDM Chapter 8,Highway Drainage,Section 8.6.2.4,Economics
- Shelf Notes:
- No
- Standard Book:
- No
- Supersedes These:
- (83-015) Drainage Pipe Optional (For Driveways, Gravel And Dirt Surfaced Roadways)
- Superseded By:
- (09-026) Highway Design Manual Revision No. 56 - Chapter 8 - Highway Drainage
- File:
- EI 08-003
- Abstract:
- This EI issues revised guidance regarding pipe material selection.