Document Details
Document Number:
EI 05-005
Title:
Revisions to Standard Specifications Section 100 - Phase 5
Status:
Inactive
Issue Date:
2/16/2005
Effective Date:
5/5/2005
Expiration Date:
5/4/2005
Resp Organization:
Office of Construction
Contact:
Brian DeWald
Phone:
518-457-9688
Email:
bdewald@dot.state.ny.us
Item Numbers:
Drawings:
Keywords:
Appendix A,training,EEO,bonds,award,force account,A+B,DBE,M/WBE,schedule,changed conditions,significant change,differing site conditions,insurance
Shelf Notes:
Yes
Standard Book:
No
Supersedes These:
(03-006) Revisions to Standard Specifications Section 100 - Phase 4
(04-010)CHAMP Reporting
(98-034)Special Note for Contractors, Bridge Painting Policy - SSPC/PCCP Requirement
(04-026)Revisions to Standard Specifications Section 100 - Phase 4B
(02-013)Revisions to Section 100 of the Standard Specifications - Section 102-21 & Section 102-22
Modifies These:
(04-032)Revisions to Standard Specifications - High-Visibility Apparel
(99-033)Guidelines for the use of Time-Related Contract Provisions
Superseded By:
(05-011) Revisions to Standard Specifications Section 100 - Phase 5A
File:
EI 05-005
Abstract:
Contains a commentary that describes the changes and lists of superseded and revised proposal inserts. Includes significant editorial/organzational revisions to Section 100. The entire section was rewritten.