Document Details


Document Number:
EI 03-007
Title:
Standard Specifications Section 206 - Trench, Culvert and Structure Excavation; 206-4.02 Trench and Culvert Excavation
Status:
Inactive
Issue Date:
2/13/2003
Effective Date:
9/11/2003
Expiration Date:
5/3/2007
Resp Organization:
Geotechnical Engineering Bureau
Contact:
Gary Douglas
Phone:
518-457-4791
Email:
gdouglas@dot.state.ny.us
Item Numbers:
REINFORCED,CONCRETE PIPE,SMOOTH INTERIOR,CORRUGATED,POLYETHYLENE,BEDDING CONTROL LINE,MIDDLE BEDDING,206.02 M,206.04 M
Drawings:
Keywords:
REINFORCED,CONCRETE PIPE,SMOOTH INTERIOR,CORRUGATED,POLYETHYLENE,BEDDING CONTROL LINE,MIDDLE BEDDING,206.02 M,206.04 M
Shelf Notes:
Yes
Standard Book:
No
Superseded By:
(06-057) 2006 Standard Specifications for Construction and Materials (Metric)
File:
EI 03-007
Abstract:
The bottom payment line for reinforced concrete pipe excavation is defined as the Bedding Control Line to allow placement of a loose bedding material in the middle third of the excavation under the pipe. The trench width for excavation for smooth interior corrugated polyethylene pipe is revised to accommodate the thick walls of these pipes and provide sufficient room for proper compaction.