Document Details
- Document Number:
- EI 02-001
- Title:
- Specification Revisions: Sections 401, 402, and 403 - Hot Mix Asphalt
- Status:
- Inactive
- Issue Date:
- 12/21/2001
- Effective Date:
- 7/11/2002
- Expiration Date:
- 5/6/2009
- Resp Organization:
- Materials Bureau
- Contact:
- Zoeb Zavery, Field Engrg 2
- Phone:
- 518-457-4582
- Email:
- srantanen@dot.state.ny.us
- Item Numbers:
- 401,402,403
- Drawings:
- Keywords:
- Shelf Notes:
- No
- Standard Book:
- No
- Supersedes These:
- (98-041) Quality Payment Items for Hot Mix Asphalt Performance Related Specifications
- (99-001)Revised Friction Aggregate Requirements in Hot Mix Asphalt Specifications
- Modifies These:
- (00-031)Requirements For Use of Specification Item 407 - Tack Coat Between All Lifts of HMA
- Modified By:
- (02-021)Design Guidance for Projects with Hot Mix Asphalt Items
- Superseded By:
- (09-006) Revision To Hot Mix Asphalt Section 401 - Plant Production
- File:
- EI 02-001
- Abstract:
- Issues revised Sections 401, 402, 403; disapproves old sections; changes sections affected by revised sections; disapproves existing special specifications with 403 root; Disapproves all other special specifications which reference disapproved sections 401, 402, 403.