Document Details
- Document Number:
- EI 99-028
- Title:
- Critical Path Method (CPM) Scheduling for DOT Construction Projects, Item 15637.61 M
- Status:
- Inactive
- Issue Date:
- 8/19/1999
- Effective Date:
- 1/13/2000
- Expiration Date:
- 9/9/2004
- Resp Organization:
- Office of Construction
- Contact:
- Dave Kent
- Phone:
- 518-457-3225
- Email:
- Item Numbers:
- A+B BIDDING,INCENTIVES,15637.61
- Drawings:
- Keywords:
- A+B BIDDING,INCENTIVES,15637.61
- Shelf Notes:
- No
- Standard Book:
- No
- Supersedes These:
- (95-023) Critical Path Method (CPM) Scheduling for DOT Construction Projects Item 15637.60 (English) & 15637.60 M (Metric)
- Superseded By:
- (04-007) Item 637.3550--20 - CPM Scheduling
- File:
- EI 99-028
- Abstract:
- Revised contract specification and special note requiring contractors to use Critical Path Method (CPM) scheduling techniques to plan and control their work.