Document Details


Document Number:
EI 19-021
Title:
NYSDOT Guidance for MASH Implementation for Railing, Barrier, and Transition Systems on Bridges
Status:
Inactive
Issue Date:
10/18/2019
Effective Date:
4/1/2020
Expiration Date:
8/2/2023
Resp Organization:
Office of Structures
Contact:
Eric Lantzy
Phone:
518-485-5270
Email:
Eric.Lantzy@dot.ny.gov
Item Numbers:
Drawings:
Keywords:
Shelf Notes:
No
Standard Book:
No
Superseded By:
(23-024) Superseding Outdated Engineering Instructions
File:
EI 19-021
Abstract:
Announces the bridge railing, barrier, and transition systems that are available for permanent use on New York State Department of Transportation (NYSDOT) projects. The NYSDOT has determined that the steel railing and concrete barrier systems identified in the table are sufficient in strength and configuration to meet the intent of the MASH-16 requirements for crashworthiness until the full scale crash tests can be run.