Document Details


Document Number:
EI 92-015
Title:
Project-Level Pavement Selection Process
Status:
Inactive
Issue Date:
4/7/1992
Effective Date:
4/1/1992
Expiration Date:
7/4/2001
Resp Organization:
Design Quality Assurance Bureau
Contact:
CAROL HENNESSY
Phone:
518-457-7278
Email:
Item Numbers:
PROJECT,LEVEL,PAVEMENT,SELECTION,PROCEDURES,REHABILITATION,4.01
Drawings:
Keywords:
PROJECT,LEVEL,PAVEMENT,SELECTION,PROCEDURES,REHABILITATION,4.01
Shelf Notes:
No
Standard Book:
No
Modifies These:
(90-023)Final PS&E Submission
Modified By:
(98-045)Highway Design Manual Revision No. 34; Chapter 21 Contract Plans, Specifications, and Estimate
(92-038)Final PS&E Submission
(93-031)Project-Level Pavement Thickness Design Manual (9/93)
(94-015)Final PS&E Submission
Superseded By:
(01-017) Comprehensive Pavement Design Manual (CPDM)
File:
EI 92-015
Abstract: