Document Details
-
Document Number:
-
EI 92-015
-
Title:
-
Project-Level Pavement Selection Process
-
Status:
-
Inactive
-
Issue Date:
-
4/7/1992
-
Effective Date:
-
4/1/1992
-
Expiration Date:
-
7/4/2001
-
Resp Organization:
-
Design Quality Assurance Bureau
-
Contact:
-
CAROL HENNESSY
-
Phone:
-
518-457-7278
-
Email:
-
-
Item Numbers:
-
PROJECT,LEVEL,PAVEMENT,SELECTION,PROCEDURES,REHABILITATION,4.01
-
Drawings:
-
-
Keywords:
-
PROJECT,LEVEL,PAVEMENT,SELECTION,PROCEDURES,REHABILITATION,4.01
-
Shelf Notes:
-
No
-
Standard Book:
-
No
-
Modifies These:
-
(90-023)Final PS&E Submission
-
Modified By:
-
(98-045)Highway Design Manual Revision No. 34; Chapter 21 Contract Plans, Specifications, and Estimate
-
(92-038)Final PS&E Submission
-
(93-031)Project-Level Pavement Thickness Design Manual (9/93)
-
(94-015)Final PS&E Submission
-
Superseded By:
-
(01-017) Comprehensive Pavement Design Manual (CPDM)
-
File:
-
EI 92-015
-
Abstract:
-