Document Details


Document Number:
EI 17-008
Title:
Restrictions on Use of Weak-Post W-Beam, HPBO Terminals, and Half-Section Concrete Barrier
Status:
Active
Issue Date:
10/20/2017
Effective Date:
1/1/2018
Expiration Date:
Resp Organization:
Design Quality Assurance Bureau
Contact:
Terry Hale
Phone:
518-485-7009
Email:
Terry.Hale@dot.ny.gov
Item Numbers:
Drawings:
Keywords:
AASHTO, FHWA, Safety, Hardware, MASH, NHS, Modification Analysis
Shelf Notes:
No
Standard Book:
No
Supersedes These:
(12-018) Design Guidance for Use of Energy-Absorbing End Terminals for Corrugated Beam Systems
File:
EI 17-008
Abstract:
The “AASHTO/FHWA Joint Implementation Agreement for the AASHTO Manual for Assessing Safety Hardware, 2015”, approved on December 21, 2015, places a series of deadlines on when different roadside barriers used on the National Highway System (NHS) must be successfully crash tested to MASH. The first two deadlines affect only W-beam systems and Concrete barriers and are therefore the subject of this Engineering Instruction (EI).