Document Details


Document Number:
EI 13-024
Title:
New Items for: Transition Between Half-section and Full- section single slope concrete barrier
Status:
Inactive
Issue Date:
11/29/2013
Effective Date:
5/8/2014
Expiration Date:
9/27/2015
Resp Organization:
Design Quality Assurance Bureau
Contact:
Terry Hale
Phone:
518-485-7009
Email:
Terry.Hale@dot.ny.gov
Item Numbers:
606.9003, 606.9004
Drawings:
606-32
Keywords:
pier, continuity, precast
Shelf Notes:
No
Standard Book:
No
Superseded By:
(15-031) Superseded Issuances Resulting from Adoption of Electronic Standard Specifications as Official Documents
File:
EI 13-024
Abstract:
New Standard Specifications issued to provide standard items needed to transition from half-section to full-section single slope concrete barrier. Full-section is new requirement for pier protection. Transition sequence often needed from steel guide rail to pier protection concrete. Existing transitions only addressed guide rail to half-section portion of sequence.