The requirements of 105-03 Methods and Equipment are being revised to coincide with the requirements of 203-3.01A. Winter Earthwork Submittal. These revisions align with the revisions to Section 203 Excavation and Embankment.
The requirements of 203-3.02 Archaeological Salvage are being removed from Section 203 Excavation and Embankment and placed into 107-01D. Archaeological Salvage. By moving the requirements to 107-01D. Archaeological Salvage it will incorporate the obligation into the general provisions of the Standard Specifications, which are applicable to all contracts.